top of page

Factory audit

• Supplier evaluation

• Prices and conditions

• Confirmation Samples Control

• Laboratory Test Support

• Fitting

• QC incoming material

• Pre-production meeting

• Line configuration

• Pre-production test

• Die-cutting test

• Inspection during production

• Production monitoring with in-line QC

• Order tracking

• Pre-shipment quality control

• Inspection before shipment

• Supervision of container loading

• Inspection standard: AQL table /

• Inspection criteria: Classification of defects. · ASTM D5430 4-point system

• Inspection report delivered within 24 hours; same day report available.

bottom of page