top of page
• Factory audit
• Supplier evaluation
• Prices and conditions
• Confirmation Samples Control
• Laboratory Test Support
• Fitting
• QC incoming material
• Pre-production meeting
• Line configuration
• Pre-production test
• Die-cutting test
• Inspection during production
• Production monitoring with in-line QC
• Order tracking
• Pre-shipment quality control
• Inspection before shipment
• Supervision of container loading
• Inspection standard: AQL table /
• Inspection criteria: Classification of defects. · ASTM D5430 4-point system
• Inspection report delivered within 24 hours; same day report available.
bottom of page